                  Ruling machine work error cleaning of several skills


                  Release time:2019/3/6 15:27:29 Source:www.m.liftexpress.com.cn/

                  Abstract:Ruling machine work, a lot of have no contact with hot melt marking machine marking construction cli

                  Ruling machine work, a lot of have no contact with hot melt marking machine marking construction clients often have such misunderstanding, think hot melt marking and room temperature cold spray, as long as there is a hot melt marking machine can the construction. However, the reality is hot melt marking construction is much more complicated than the normal temperature line construction.

                  Surface cleaning: specialized personnel arrangements for road surface cleaning, guarantee the road dry clean, no dust. Measuring lofting: under the condition of the road clean, dot carried out in accordance with the design drawing, and then choose white latex material road edge line line, check and correct lines of the reentry after delimit work. Lines delimit:

                  a: Add the hot melt coating into the hot melt kettle and heat it evenly to the appropriate temperature
                   
                  b: On one side of the laid waterline, the special primer for road shall be uniformly applied to make the road surface and the marking better stick together, and the evaporation of underground water shall be isolated to prevent the marking from falling off after construction.
                   
                  c: The hot melt coating melted to the construction state shall be loaded into the push type construction vehicle, and an appropriate amount of glass beads shall be put into the vehicle body.
                   
                  d: Regulate the flow, and conduct formal construction when the bottom oil is dried to a proper degree. The construction shall be based on the waterline to ensure the construction quality.
                   
                  e: The coating thickness of lane edge line, lane boundary line, guide arrow, road centerline, warning markings, etc. is 1.5-2.0mm, and the thickness of deceleration markings is 5mm. The glass beads on the surface shall be evenly distributed, and the marked lines shall have good visibility, consistent width, equal spacing, even edges, good reflective effect, and firm connection with the road surface.
                   
                  Construction skills of hot melt marking with marking machine
                   
                  As the hot melt marking construction of the marking machine, the powder hot melt marking coating needs to be heated to a high temperature of 180-200 degrees Celsius and melted into liquid before use. For the sake of construction safety, small hot melt marking machines will separate the marking device and the heating equipment for heating and melting paint, which can avoid unnecessary burns and greatly improve the efficiency of melting materials. Generally, the hot melt marking equipment required by the preliminary marking construction team includes: hydraulic double cylinder hot melt kettle, hand push hot melt marking machine, hand push hot melt zebra crossing machine, hand push pre marking machine, etc.
                   
                  Cleaning: During the construction, the construction line shall be marked while cleaning to ensure that there is no throwing, sprinkling, dripping, leakage and pollution, and the equipment is free of oil and water leakage. The construction team shall clean the road surface in the area at a certain distance from the marking line in time to keep the road surface clean and tidy without pollution and damage. Among them, the LXD1200 oil and gas dual cylinder hot melt kettle is recommended to use a hydraulic dual cylinder hot melt kettle. This type of hot melt kettle adopts vehicle design, which is greatly convenient for transportation. At the same time, it has the characteristics of high melting material efficiency, good melting material quality, less fuel use, energy conservation and environmental protection, simple operation, high safety, etc. It is very efficient to cooperate with the manual marking machine for the construction of yellow and white hot melt flat long solid marking lines and short virtual marking lines.
                   
                  The marking materials of Guruike series marking machine shall comply with the provisions of Pavement Marking Paint (JT/T280-2004).
                   
                  (2) The pavement shall be carefully cleaned before the construction of pavement markings. The pavement surface shall be dry and free of dust.
                   
                  (3) The pavement polluted by marking construction shall be cleaned in time to ensure that the pavement is clean.
                   
                  (4) The alignment of the marking line shall be smooth, consistent with the road shape, and the curve shall be smooth. No broken line is allowed.
                   
                  (5) The reflective marking glass beads shall be evenly distributed, firmly attached and evenly reflected.
                   
                  (6) The thickness of the marking line shall be constructed in full accordance with the requirements, and the service time limit shall be ensured.
                   
                  (1) To ensure the quality of the project construction process, carefully review the construction drawings before commencement, prepare the construction organization design according to the actual situation, and after approval, strictly follow the construction organization design.
                   
                  (2) The quality of engineering materials shall be guaranteed. Establish strict material receiving and releasing system. No unqualified materials shall be allowed to enter the site for construction.
                   
                  (3) , control quality from the management system
                   
                  a: All construction personnel shall conduct self inspection.
                   
                  b: The quality inspection shall be conducted once every certain distance of the construction, and the construction supervisor shall personally supervise
                   
                  c: The technical disclosure system shall be implemented, and the technical disclosure must be carried out before the commencement of construction

                  Please indicate the source of the reprint:http://www.m.liftexpress.com.cn//en/news/3639.html。

                  Contact us

                  Get in touch with us. Please use the following contact at will.

                  Enter Your name
                  Please enter your mailbox account
                  Fill out your message here
                  Send success
                  I'm sorry, your sending is wrong.

                  Address:Shangdang town of Dantu District,Zhenjiang City,Jiangsu Province,China Telephone:+86 13852907688  fuhao@m.liftexpress.com.cn www.m.liftexpress.com.cn/
                  主站蜘蛛池模板: 婷婷狠狠综合五月天| 男女高潮喷水在线观看| 国产成人精品三上悠亚久久| 国产三级久久久精品麻豆三级| 亚洲综合无码一区二区痴汉| 亚洲经典av一区二区| 亚洲色婷婷综合久久 | 大伊香蕉精品视频在线天堂| 成人av天堂男人资源站| 中文字幕 亚洲精品 第1页| 国产私人尤物无码不卡| 西西444www高清大胆| 国产在线国偷精品免费看| 中文字幕 欧美精品 第1页| 麻豆a级片| 免费看成人aa片无码视频羞羞网| 亚洲精品自产拍在线观看动漫| 精品一区二区三区蜜桃久| 国产亚洲精品久久久久久| 国产公开久久人人97超碰| 国产乱老熟女乱老熟女视频| 亚洲色丰满少妇高潮18p| 亚洲国产成人久久久网站| 成年女人免费碰碰视频| 无码高潮少妇毛多水多水| 最新国产成人ab网站| 亚洲AV旡码高清在线观看| 国产95在线 | 欧美| 精品久久久久久国产潘金莲| 久久69国产精品久久69软件| 好大好硬好深好爽想要| 国内精品乱码卡一卡2卡三卡| 国产自产对白一区| 一级成人a做片免费| 国产区精品一区二区不卡中文| 影音先锋手机av资源站| 看亚洲黄色不在线网占| 人妻有码av中文字幕久久琪| 成人国产精品一区二区视频| 亚洲精品一区二区动漫| 国产欧美另类久久久精品图片|